January 18, 2022 | 11:08

Feasibility study on way for expressway in Dong Thap

Anh Tú

The Ministry of Transport (MoT) has assigned the My Thuan project management board to prepare a feasibility study on the construction of the first phase of the My An - Cao Lanh Expressway in the Mekong Delta’s Dong Thap province. The project is 26 km in length, with total investment of more than VND4.77 trillion ($208.6 million).

Feasibility study on way for expressway in Dong Thap
Photo: Illustration
Attention
The original article is written and published on VnEconomy in Vietnamese, then translated into English by Askonomy – an AI platform developed by Vietnam Economic Times/VnEconomy – and published on En-VnEconomy. To read the full article, please use the Google Translate tool below to translate the content into your preferred language.
However, VnEconomy is not responsible for any translation by the Google Translate.

Google translate