September 30, 2022 | 13:34

Flight management works being built at Long Thanh airport

Anh Tú

Construction of the second component project, “Flight management works”, at Long Thanh International Airport, with total investment of nearly VND3.5 trillion ($146 million), began sooner than expected on September 29. Main items are the Air Traffic Control Tower and auxiliary works, which are expected to be put into operation in 2025.

Flight management works being built at Long Thanh airport
The Air Traffic Control Tower at Long Thanh airport (perspective drawing) (Photo from VnEconomy)
Attention
The original article is written and published on VnEconomy in Vietnamese, then translated into English by Askonomy – an AI platform developed by Vietnam Economic Times/VnEconomy – and published on En-VnEconomy. To read the full article, please use the Google Translate tool below to translate the content into your preferred language.
However, VnEconomy is not responsible for any translation by the Google Translate.

Google translate