September 28, 2021 | 10:52

Upgrade of Duong River on way

Anh Tú

The Duong River upgrade project in Vietnam’s north is to begin this year and be completed in 2025 with total investment of nearly VND1.8 trillion ($79.4 million), removing a long-standing “bottleneck” along the Waterway Transportation Corridor No.1.

Upgrade of Duong River on way
Photo: Illustration
Attention
The original article is written and published on VnEconomy in Vietnamese, then translated into English by Askonomy – an AI platform developed by Vietnam Economic Times/VnEconomy – and published on En-VnEconomy. To read the full article, please use the Google Translate tool below to translate the content into your preferred language.
However, VnEconomy is not responsible for any translation by the Google Translate.

Google translate