Hợp tác phát triển xe máy điện: Giải pháp hiệu quả cho doanh nghiệp Việt nâng cao năng lực cạnh tranh 28/04/2023
Quang Binh approves 750ha urban zoning plan 04/06/2025 The plan serves as a tool to guide investment and construction, connect infrastructure, and implement detailed projects within the area.
Construction of a new passenger terminal of Dong Hoi airport begins 21/04/2025 The Passenger Terminal T2 having a capacity to serve three million passengers annually.
Quang Binh approves major development project for Dong Hoi airport 04/04/2025 The project requires a total investment capital exceeding VND1.863 trillion (approximately $72.3 million).
Quang Binh welcomes the first international flight 01/04/2025 The flight, operated by Vietjet Air, departed Taipei at 4:40pm and landed in Dong Hoi airport at 7:40pm on March 31.
Quang Binh approves construction of new terminal at Dong Hoi Airport 21/09/2023 Terminal designed to cater to 3 million passengers each year.
Capital secured to build new terminal at Dong Hoi Airport 04/07/2023 Investment in second terminal estimated at $94mln.